Dea STING/24 Istruzioni per l'uso e avvertenze - Pagina 6

Sfoglia online o scarica il pdf Istruzioni per l'uso e avvertenze per Apriporta Dea STING/24. Dea STING/24 18. Electro-mechanical operator for swing gates

Dea STING/24 Istruzioni per l'uso e avvertenze
Connection for 24V and 230V version with
encoder
• For the operator power supply connection fol-
low the instructions of the basic version.
• Open a second hole in the plastic cover and
apply the second provided cable clamp (a re-
duced M16).
• Use a 3x0,75mm² (ex. H05RN-F) and follow
the diagram to correctly connect the encoder
to the control board.
• Use the cable with panduit connector supplied
in the kit to connect the previously used ca-
ble to the control board, by using the clamp 3
"poli" inside the package.
WARNING Maintain the ground conductor at a major length respect the active conductors so that, if the cable exit from its fixing housing,
the active conductors tighten up as first.
WARNING Respect the Phase-Neutral polarity of the tension as explained by the instructions manual of the control panels of MAC/STING.
• Re-assemble the plastic cover ensuring that any cable do not touch moving parts of the operator.
WARNING while installing, maintain a proper distance between the power cable conductors and the operator.
Program the control board to complete all adjustments. It is now possible to supply a complete installation in compliance with all
standards required for gate automation. See the instructions provided with the control panel to be connected.
Finally, verify that all adjustments operations have been correctly performed and that safety devices and unlocking device properly
work.

6 START-UP

The start-up phase is very important to ensure maximum security and compliance to regulations, including all the requirements of EN
12445 standard which establishes the test methods for testing the automation for gates.
DEA System reminds that all installation, maintenance, cleaning or repair operations on any part of the system must be performed
exclusively by qualified personnel who must be responsible of all texts requie by the eventual risk;

6.1 Installation test

The testing operation is essential in order to verify the correct installation of the system. DEA System wants to summarize the proper
testing of all the automation in 4 easy steps:
• Make sure that you comply strictly as described in paragraph 2 "WARNINGS SUMMARY";
• Test the opening and closing making sure that the movement of the leaf match as expected. We suggest in this regard to perform
various tests to assess the smoothness of the gate and defects in assembly or adjustment;
• Ensure that all safety devices connected work properly;
• Perform the measurement of impact forces in accordance with the standard 12445 to find the setting that ensures compliance with
the limits set by the standard EN12453.
WARNING Using spare parts not indicated by DEA System and/or incorrect re-assembly can create a risk to people, animals and
property and also damage the product. For this reason, always use only the parts indicated by DEA System and scrupulously follow all
assembly instructions.

6.2 Unlocking and Manual operation

In the event of malfunctions or simple power failure, release the motor (Pic. 8) and perform the operation manually.
The knowledge of the unlocking operation is very important, because in times of emergency the lack of timeliness in acting on such
a device can be dangerous.
WARNING The efficancy and safety of manual operation of the automation is guaranteed by DEA System only if the installation has
been installed correctly and with original accessories.
24V with encoder
brown
green
green
white
2(blue)
CLOSE
1(red)
OPEN
230V with encoder
brown
green
green
white
1(white)
CLOSE
2(blue)
COM
3(black)
OPEN
}
ENCODER
M
}
ENCODER
M
11