Majestic Portofino Manuale di installazione - Pagina 10
Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature per il bagno Majestic Portofino. Majestic Portofino 14. 17- or 24-mm surface wall profiles
Anche per Majestic Portofino: Manuale di installazione (14 pagine)
Using glass lifters, replace the glass in-line panel into the silicone
25
lined profile and make sure the end of the glass panel is in line
with the open end of the profile.
To protect the return panel from being
27
damaged you can slide the vertical 1956 (1)
seal onto its exposed vertical edge; cut the
seal to size.
Fixed Panel
Hinge packer
1
The Majestic Shower Company Limited
One North Place, Edinburgh Way, Harlow Essex
CM20 2SL England,
Loosely fix the faceplates to the glass-to-wall brackets through the
26
holes in the glass inline panel; fully tighten the wall screws.
Door Panel
Ensure the glass inline panel is plumb vertical and level with the
return panel, then fully tighten the glass-to-wall bracket faceplates.
Hinge
packer
90°
Insert a black rubber hinge packer into the inline panel hinge
28
slots, as shown. Disassemble the hinges, being careful not to
damage the polished surfaces. Place the hinges and faceplates
either side of the hinge slots in the glass inline panel, with
gaskets inserted and Allen bolts facing inwards; loosely screw
the hinges and faceplates together.
Check they are 90° with the glass using a set square.
Telephone + 44 (0) 8448 001 500
Facsimile + 44 (0) 1279 635 074
[email protected] www.majesticshowers.com
Fixed Panel
90°
Hinge
packer
Fixed Panel
Fixed Panel
Hinge packer
Hinge packer