AIRFLO ZB-250 Manuale di istruzioni - Pagina 5
Sfoglia online o scarica il pdf Manuale di istruzioni per Fabbricatore di ghiaccio AIRFLO ZB-250. AIRFLO ZB-250 9.
Control Panel Operation
Area
ADD WATER
Indicators
Buttons
TIMING/CLEAN
Operating Instructions
Step 1 Fill the unit with water
Connect the external water pipe located at the back of unit to the water tap.
Step 1.1
Insert filter bracket into the
hole at the back of the unit
or assemble the filter
bracket onto back of the unit
with a thread
Step 1.2
Take off the film of the filter
and take off the covers from
both sides
Mark
Check the water supply
TIMING
The timer is working or time is under setting.
The unit is in the process of making ice
ICE
ICE FULL
An alert informing you that the ice container is full
CLEAN
The unit is under auto-clean process.
LED screen
Button to change time setting
Switch to turn the unit on of off
ON/OFF
Set timer function or turn on auto clean function
Description
- 5 -