Major tech MT478 Manuale d'uso - Pagina 13
Sfoglia online o scarica il pdf Manuale d'uso per Apparecchiature di prova Major tech MT478. Major tech MT478 16. Voltage tester
5. Operation
"L" signifies that the supposed phase L1 is the actual phase L2 and the
supposed phase L2 is the actual phase L1.
When re-testing with exchanged test probes the opposite symbol has to be
illuminated.
5.8 Measurement Point Illumination
Voltage testers are equipped with a measurement point illumination
feature. Thus, working under bad lighting conditions (e.g. division switch
cabinets) is made easier. Press button for measurement point illumination
(15) on instrument rear.
5.9 Maintenance
When using voltage testers in compliance with the instruction manual, no
particular maintenance is required. If functional errors occur during normal
operating, our service department will check your instrument without delay.
5.10 Cleaning
Prior to cleaning, remove voltage test from all measurement circuits. If the
instruments are dirty after daily usage, it is advisable clean them by using
a damp cloth and a mild household detergent. Never use acid detergents
or dissolvents for cleaning.
After cleaning, do not use the voltage tester for a period of approx. 5
hours.
13