Gammon GTP-9330-101 Installazione e funzionamento - Pagina 3
Sfoglia online o scarica il pdf Installazione e funzionamento per Strumenti di misura Gammon GTP-9330-101. Gammon GTP-9330-101 4. One-cc water probe
GAMMON TECHNICAL PRODUCTS, INC.
INSTRUCTIONS: INSTALLATION AND OPERATION
ONE-CC WATER PROBE
GTP-9330
3. Separate the 2 sections of the pump
by unscrewing the piston (insulated
by heat shrink) from the hardcoat
anodized
4. Hold the cylinder vertically in one
hand with the small end down and
resting on a finger tip. Fill the
cylinder to the top with clean water.
DO NOT USE DISTILLED OR
DEIONIZED
5. Insert the piston and rotate until the
first thread is engaged. There is now
1 cc (1 ml) of water in the cylinder
for
performing
6. Insert the small end of the cylinder to
connect it to the probe assembly and
rotate both halves of the water
injection pump clockwise to engage
the
CAUTION: NEVER ATTACH THE
WATER PUMP IF THE PISTON IS
NOT INSTALLED. FUEL WILL
BE
7. Rotate the piston (section insulated
with heat shrink) clockwise rapidly
to inject one cc of water into the
probe. If a "water in sump" signal is
received, the probe is operating
correctly. In some cases, a second
injection may be necessary. If the
signal is not received, the probe has
failed
cylinder.
WATER.
the
test.
bayonet
pin.
RELEASED.
the
test.
INSTRUCTION 6414
REVISED 6/20/18
Page 3 of 4