Bermuda BREEZE 20 Manuale di istruzioni - Pagina 5

Sfoglia online o scarica il pdf Manuale di istruzioni per Pompa dell'acqua Bermuda BREEZE 20. Bermuda BREEZE 20 8. Air pumps

Operation

Switch on the air pump. If the overall air output is too high it is recommended
that one of the air stones and air lines is removed and the remaining valves
opened to reduce the air output to the remaining stones.
Adjustments to individual air stones can now be made. Shut off the individual
vales in small amounts until the desired output is achieved.

Cleaning and maintenance

The Bermuda Breeze range of air pumps are designed to run continuously
with the minimum amount of maintenance. Ideally, all outlets should have an
air line and air stone connected and used, this will give the pond maximum
aeration and ensure that damaging back-pressure is kept to a minimum.
Regular cleaning of the air stones and hose is advised to maintain optimum
air flow into the water. Air stones will become blocked which will reduce the
perfonmance of the pump over time, so replacing air stones every 12 months
will ensure complete aeration of your pond.
IMPORTANT: If all the pump air outlets are not needed ensure that one of the
valve outlets is opened in order to bleed off some of the airflow, which will
adjust the air output to the remaining stones. This will reduce noise levels by
reducing he back pressure on the pump and extend the life of the air pump.
Check and clean the filter sponge at the top of the air pump
Remove the screw caps on the top of the air pump.
Remove the two screws and lift off air suction cover on the top of the air
pump.
Remove the white filter sponge and clean with running water, ensuring
completely dry before re-assembling.
5