MAJORITY SCAFELL PIKE SKP-BAR-BLK Manuale di istruzioni - Pagina 8
Sfoglia online o scarica il pdf Manuale di istruzioni per Impianto stereo MAJORITY SCAFELL PIKE SKP-BAR-BLK. MAJORITY SCAFELL PIKE SKP-BAR-BLK 20. Audio soundbar & wired subwoofer
Wall Mounting
Safety
1/. Installation must be carried out by quali ed personnel only.
Incorrect assembly can result in severe personal injury and property
damage. If you are going to install this Soundbar yourself, you must
have studied installations, such as electrical wiring and plumbing that
may be buried inside the wall. It is installer's responsibility to verify that
the wall safely support the total load of the Soundbar.
2/. Additional tools (not included) are required for the installation.
3/. Do not over-tighten screws.
4/. Keep this user manual for future reference.
5/. Use an electric stud nder to check the wall type before drilling and
mounting.
Tools & xings required
1/. Drill tted with masonry drill bit
3/. Pencil
5/. Spirit level
Place the soundbar in the desired position and using a spirit level
check that the soundbar is level.
Make a light pencil mark on the wall at the top edge of both xing
brackets. The mark should be positioned directly above each bracket.
Note the mounting points on the soundbar (one is 160mm from the
end while the other is 160mm from the other end),so you should use
the soundbar as a template to get the right mounting positions.
Place the soundbar away from the work area and then mark two
xing points 7mm below the light pencil marks for the screws. These
marks should be 470mm apart and level. Before drilling, use a spirit
level to check that the xing points marked are level.
6
2/. Screwdriver
4/. Ruler
Fi
Us
RC
un
Th
so
Tu