Decor Star PL-005-SS Manuale - Pagina 8

Sfoglia online o scarica il pdf Manuale per Apparecchiature per il bagno Decor Star PL-005-SS. Decor Star PL-005-SS 10.

Installation (cont.)
1"
Decor Star
4. Using a drill with a tile bit, drill the hole
slowly into the tile. Do not drill into any piping
or wiring in the wall. Insert the anchors into
the wall. (NOTE: Before installing the wall
anchors, use a small piece of painters tape
or masking tape over the drill area. This will
prevent damages to the tile)
5. Secure the mounting brackets to the wall.
6. Apply thread sealant tape to the threading
on the shut off valves before connect both hot
and cold water supply hoses to the valves.
Turn on the valves and check all connections
for possible leaks.
8
PL-005-SS Rev. A3 122015