Garage Tek GT100010A Manuale di installazione - Pagina 6

Sfoglia online o scarica il pdf Manuale di installazione per Immagazzinamento Garage Tek GT100010A. Garage Tek GT100010A 16. Garage overhead storage racks

Garage Tek GT100010A Manuale di installazione
STEP 1: 4FTX 4FT & 4FTX 8FT RACK-FOR CEILING BRACKET INSTALLATION
(SOLID CONCRETE CEILING)
WE PROVIDED WOOD SCREWS AND SOLID CONCRETE CEILING ANCHORS FOR THIS INSTALLATION.
PLEASE DETERMINE THE TYPE OF CEILING YOU HAVE BEFORE STARTING.
SOLID CONCRETE CEILING:
A: USE THE DRILL TEMPLATE TO MARK THE MOUNTING HOLES FOR INSTALLATION.
A1: START FROM THE LEFT, PLACE THE DRILL TEMPLATE AND MARK THE (2) HOLES.
A2: FROM THE (1) END MEASURE 48", PLACE THE DRILL TEMPLATE AND MARK THE NEXT SET OF (2) HOLES.
A3: FOR 4FT X 8FT RACK ONLY, MEASURE 48" OVER, PLACE THE DRILL TEMPLATE AND MARK THE NEXT SET OF (2) HOLES.
B: PILOT HOLES CONCRETE CEILING: USE A 15/32" (12 mm) DIA. MASONARY DRILL BIT AND DRILL A 2 3/8" (60mm)
DEEP HOLE FOR EACH ANCHOR.
C: INSERT (1) ANCHOR INTO EACH HOLE. USE A RUBBER MALLET TO TAP THE ANCHOR INTO THE CEILING.
D: FASTEN THE CEILING BRACKETS TO THE ANCHORS. USE A DRILL AND THE SUPPLIED NUT DRIVER.
SEE ANCHOR INSTRUCTIONS BELOW, FIG D1-D4.
48.000in
1219.20mm
48.000IN
[1219.20mm]
REUSE THE DRILL TEMPLATE TO MARK MOUNTING HOLES ON THE CEILING
CONCRETE CEILING
DRILL MARKED MOUNTING HOLES
(2) MOUNTING HOLES REQUIRED
PER CEILING BRACKET.
USE A MASONARY DRILL BIT
KEEP EACH SET OF CEILING BRACKETS IN A STAIGHT LINE
MARKED MOUNTING
HOLE WITH PENCIL
11/64"
[
4.5mm]
MOUNTING HOLE DIMENSIONS
48.000in
1219.20mm
FOR 4FT X8FT RACK
ONLY
FOR 4FT X8FT RACK
ONLY
ANCHOR
2 3/8"
[60mm]
DRILLED
HOLE
ANCHOR
FIG. D1
FIG. D2
CEILING
BRACKET
FIG. D3
SUPPLIED
NUT DRIVER
DRILL
FIG. D4
PAGE 6