Garmin ECHOMAP ULTRA 106sv Manuale di istruzioni per l'installazione - Pagina 8

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Sistema GPS marino Garmin ECHOMAP ULTRA 106sv. Garmin ECHOMAP ULTRA 106sv 13.

Garmin ECHOMAP ULTRA 106sv Manuale di istruzioni per l'installazione
Installing the Ferrite Beads on the Cables
To comply with regulations and to reduce noise, you should install the included ferrite beads on the NETWORK
cables, 12 PIN XDCR cable, and LVS XDCR cable.
1 Snap one ferrite bead around each of the specified cables, as close to the
connectors as possible.
2 Secure the ferrite bead to the cable using the included zip ties.

Installing the Device in the Cradle

After the cables are connected to the cradle, you can quickly place the device in the cradle.
1 Press the button on the release lever and lift the lever to unlock it.
2 Place the base of the device in the bottom of the cradle.
3 Lift the lever.
4 Tilt the top of the device toward the cradle.
5 Press the button on the lever, and push the lever down until the device clicks in place.

Removing the Device from the Cradle

1 Press the button on the release lever on the cradle, and pull the lever up.
2 Tilt the device forward, and lift the device out of the cradle.
8