AC Schnitzer DKG Manuale di istruzioni per il montaggio - Pagina 16

Sfoglia online o scarica il pdf Manuale di istruzioni per il montaggio per Automobile Accessories AC Schnitzer DKG. AC Schnitzer DKG 16. Aluminium pedal set

AC Schnitzer DKG Manuale di istruzioni per il montaggio
F it t in g In s t r u c t io n s
AC Schnitzer – Aluminium Pedal Set –
2. Fitting .... (cont'd.)
Fig. 10
Place AC Schnitzer aluminium gas pedal on the standard
gas pedal, and press firmly.
Warning:
Align AC Schnitzer aluminium gas pedal precisely be-
fore affixing. Adhesive pad grips immediately.
Fig. 11
Drill a 2.5 mm hole in the standard gas pedal through each
hole in the AC Schnitzer aluminium gas pedal.
Note!
Do not drill larger than Ø 2.5mm else the self-tapping
countersunk head bolts will not grip.
Fig. 12
Fit AC Schnitzer aluminium gas pedal using the self-
tapping countersunk head bolts Ø 3x14mm supplied, and
tighten.
Subject to errors, modifications and technical development!
Fitting Instructions No.: 3520 10 (20) 110-120-130-310 / Issue: 26.06.2017/ TSch / REV01
AC Schnitzer - Neuenhofstraße 160 - D - 52078 Aachen - Tel. 0241/5688 -130 Fax -135 / www.ac-schnitzer.de
16