Kohler 1.1785.002 Manuale di installazione - Pagina 28

Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature per il bagno Kohler 1.1785.002. Kohler 1.1785.002 41. Thermostatic electric shower

Kohler 1.1785.002 Manuale di installazione
Post Installation Procedure (Continued)
8
Turn on the electrical
supply.
11
Start the shower to test for water flow.
The shower will beep once (3 times
when set in BEAB mode) and the white
start/stop light and orange status light
(green in BEAB Mode) will pulse. Wait
until the lights go solid and the shower
will beep again.
13
Push Start/Stop to turn off appliance.
Pulsing start/stop light and "beep"
indicates that appliance is shutting down.
This completes the installation of the Mira Advance shower. Please advise the
user how to operate their new shower and leave them with user instruction
guide.
1306246-W2-D
9
Turn on the power to appliance,
check Start/Stop for white light.
Note! The shower will beep 3
times if set to BEAB mode
28
10
Turn the temperature
control to number 8.
12
Turn the temperature control to the full
hot position and continue to run the
shower for at least 1 minute.
14
Appliance will purge water from heater
tank for a few seconds.
Important! DO NOT isolate power until
water has stopped.