Kohler 1.1785.005 Manuale di installazione - Pagina 27

Sfoglia online o scarica il pdf Manuale di installazione per Apparecchiature per il bagno Kohler 1.1785.005. Kohler 1.1785.005 41. Thermostatic electric shower

Kohler 1.1785.005 Manuale di installazione
Post Installation Procedure
1
Turn on the electrical
supply.
4
5 secs
Start the shower to test for water
flow and run for at least 1 minute. If a
shower drain pump is fitted, it should
also start. If there is no water after 5
seconds, make sure that appliance
has been primed.
6
P u s h S t a r t / S t o p t o t u r n o ff
appliance. Pulsing start/stop light
and "beep" indicates that appliance
is shutting down.
2
Turn on the power to appliance,
check Start/Stop for white light.
5
The shower will beep once when start/stop
button is pressed (3 times for BEAB mode).
The white start/stop and blue status light will
pulse and shower will beep again. After a few
seconds the shower will beep again and the
lights will go solid. This will confirm flow and
cold temperature.
7
Appliance will purge water from heater tank
for a few seconds.
Important! DO NOT isolate power until water
has stopped.
27
3
Turn the temperature to
full cold.
x1
BEAB X 3
1306246-W2-D
x1