Kohler AWAKEN Geometric 72415T-E Istruzioni per l'installazione

Sfoglia online o scarica il pdf Istruzioni per l'installazione per Apparecchiature per il bagno Kohler AWAKEN Geometric 72415T-E. Kohler AWAKEN Geometric 72415T-E 2. Multi function hand shower
Anche per Kohler AWAKEN Geometric 72415T-E: Istruzioni per l'installazione (2 pagine)

Kohler AWAKEN Geometric 72415T-E Istruzioni per l'installazione
INSTALLATION INSTRUCTIONS
BEFORE YOU BEGIN
All information is based on the latest product information available at the time of publication. Kohler Co. reserves
the right to make changes in product characteristics, packaging, or availability at any time without notice.
Please leave these instructions for the consumer. They contain important information.
NOTES:
1. Flush the water supply pipes thoroughly to remove debris.
2. An in line water filter must be used with this product.
3. The highest working pressure for hand shower is 0.5MPa(5 bar). If it exceeds 0.5MPa(5 bar), a pressure reducer
is needed. The highest water and environment temperature is 60°C. Please keep hand shower, shower head and
the shower arm away from heater, or it may become damaged and cause injury to the user.
4. Observe local plumbing codes.
5. All installations should comply with the relevant requirements of AS/NZS 3500 and AS/NZS 6400.
ROUGH-IN DIMENSIONS
INSTALLATION
Flush both water supply
installed.
Put the screen washer(2, not provided) into the shower hose(3, not provided)
connector. Attach the hand shower to shower hose. Note: Don't over tighten.
Connect another end of shower hose to the water supply.
1240793-AN2-A
72415T-E Multi Function Hand Shower-Geometric
Ø110
G1/2˝
for about one minute before the hand shower(1) is
72415T-E
AWAKEN
3
1
2
1