Kohler HYDRO-TOWER 300 Istruzioni per l'installazione - Pagina 23
Sfoglia online o scarica il pdf Istruzioni per l'installazione per Servizi igienici Kohler HYDRO-TOWER 300. Kohler HYDRO-TOWER 300 27. Floor standing toilet
Anche per Kohler HYDRO-TOWER 300: Manuale di istruzioni per l'installazione (18 pagine)

2. Loosen the long screws as shown.
2.
3. Tighten the locknut to the marked position of OPEN to
take out the supporting board.
3.
4. Take out the supporting board as shown.
4.
5. Take out the break water board.
5.
6. Take out the pole lock and the reversed lock as shown.
6.
1263048-T01-D
"
"
OPEN
Supporting Board
-15-
Detent
Reversed Lock
Pole Lock
Supporting Board
Locknut
Supporting Board
Mask
Slot B
B
Break Water Board
Slot A
A