Dexter Laundry DCBD80KC-10 Series Manuale dell'operatore - Pagina 6
Sfoglia online o scarica il pdf Manuale dell'operatore per Asciugatrice Dexter Laundry DCBD80KC-10 Series. Dexter Laundry DCBD80KC-10 Series 17.
INSTALLATION AND OPERATING INSTRUCTIONS
UNCRATING
Tools required: 3/4" hex socket and ratchet driver, knife, channel-lock wrench that opens to 1 3/8".
1. Remove the plastic wrap with knife. Remove cardboard rails, fillers and top cap.
2. Using a ratchet and a 3/4" socket, remove the (4) bolts attaching the wooden skid to the dryer cabinet. Save
the bolts for future moving of the dryer.
3. With a walking motion, move the dryer forward completely off the wooden skid. Save the skid for future
moving of the dryer.
4. Using the channel-lock wrench, adjust the leveling legs to align the machine with adjacent units.
Note: If the dryer is ever moved again, the dryer should be re-mounted on its pallet and its crating bolts re-
inserted and tightened, in the reverse order as above.
DRYER INSTALLATION
1. CODE CONFORMITY. All commercial dryer installations must conform with local codes, or in the absence of
local codes, with the latest edition of the National Fuel Gas Code ANSI Z223.1. Canadian installations must comply
with the current Standard CAN/CGA-B149 (.1 or .2) Installation Code for Gas Burning Appliances or Equipment, and
local codes if applicable. Australian installations must meet installation requirements and pipe sizing requirements of
AS/NZA 5601. The appliance, when installed, must be electrically grounded in accordance with the latest edition of
the National Electric Code, ANSI/NFPA70, or, when installed in Canada, with Standard CSA C22.1 Canadian
Electrical Code Part 1.
2. INSTALLATION CLEARANCES: This unit may be installed at the following alcove clearance. (millimeters)
I. Left Side
0"
II. Right Side
0" *
III. Back
18" (457) (Certified for 1" (25) clearance; however, 18" (457) clearance is necessary behind
the belt guard to allow servicing and maintenance.)
IV. Front
48" (1220) (to allow use of dryer)
V. Top
Refer to figure on next page labeled "Vertical Clearance Dimensions".
Certification allows 0" clearance at the top 1" (25) back from the front. However, a 1/4" (6)
clearance is required to allow opening the upper service door.
A 10" (254) clearance is required from the top at all other points.
VI. Floor
This unit may be installed upon a combustible floor.
*Units may be installed in direct contact with an adjacent dryer, providing allowance is made for opening upper and
lower service doors.
Do not obstruct the flow of combustion and ventilation air.
Maintain minimum of 1" (25) clearance between duct and combustible material.
Refer to installation label attached to rear guard for other installation information.
DRYER CAPACITIES
Dryer Model
Dry Weight Capacity
DCBD30
30 lb (13.6 kg)
DCBD50
50 lb (22.7 kg)
DCBD80
80 lb (36.3 kg)
COMMERCIAL DRYER
- - 6