Avlite AV-15 Manuale di installazione e assistenza - Pagina 8

Sfoglia online o scarica il pdf Manuale di installazione e assistenza per Apparecchiature di illuminazione Avlite AV-15. Avlite AV-15 14. Solar aviation light

Avlite AV-15 Manuale di installazione e assistenza
Charging the Battery
New lights should be left in the sun for 1-2 days to ensure battery is charged before placing in
service. Please note, light will re-charge even when switch is turned to 'OFF' position.
Preferred Installation Location
For best light performance, ensure solar modules are not covered and are in clear view of the
sky with no shadows.
1. The AV-15 will be supplied preset to the requested flash code.
2. The light can be directly positioned in your desired location. Secure it, utilising the 4 x holes in the
flange. Ensure the light is bolted to an even, flat surface.
Adjusting the Flash Code
1. Remove the 4 x battery cover screws and lift the cover and battery out of the compartment to
expose the adjustment plug.
2. Unscrew the adjustment plug.
3. Using a small flat bladed screwdriver adjust the Flash Code to the desired setting.
4. Cover the light, in darkness, for at least 30 seconds to activate the light sensor. Make sure the light
is flashing correctly.
5. Uncover the light and wait at least 30 seconds to make sure the light turns off in daylight.
6. Insert the adjustment plug and replace the battery.
7. Replace the cover and secure using the 4 x screws. Do Not over tighten screws.
8. Position the light in your desired location and secure, utilising the 4 x holes in the flange. Ensure
the light is bolted to an even, flat surface.
Light
Base
Latest products and information available at www.avlite.com

Installation

Flash Codes

User
Replaceable
Battery
Battery
Position
6
AV-15 Solar Aviation Light
-
+
Battery
Terminals
OFF
ON
Adjustment
Switches