DeZurik APCO CDD-9000T Manuale d'uso - Pagina 4

Sfoglia online o scarica il pdf Manuale d'uso per Unità di controllo DeZurik APCO CDD-9000T. DeZurik APCO CDD-9000T 9. Double door check valves

DeZurik APCO CDD-9000T Manuale d'uso
DeZURIK
APCO CDD-9000T Double Door Check Valves

Description

A Double Door Check Valve consists of a valve body, torsion spring loaded hinged doors, and a
resilient seat compression molded to valve body. The spring loaded doors move away from the valve
seat to allow flow in the forward direction, and return to valve seat when upstream flow is stopped.

Handling and Storage

Lifting the valve improperly may damage it. Do not fasten lifting devices through the seat opening in the
body. Lift the valve with slings, chains or cables fastened around the valve body, or fastened to bolts or
rods through bolt holes in the flanges.
If installation will be delayed, place valve indoors in secure, weather tight storage. If temporary outside
storage is unavoidable, make sure a vermin proof rain cover (water shedding tarp, etc.) is secured
around/over the equipment to keep off rain and mud. Skid and set the assembly on a flat, solid, and
well drained surface for protection from ground moisture, runoff and pooled rain water.

Installation

The APCO CDD-9000T Double Door Check Valve may be installed in a horizontal or vertical position
(with the flow upward). Valve supports are not needed. The Valve must be installed with the hinge
pin in the vertical position for horizontal flow applications.
Before installation, remove foreign material such as weld spatter, oil, grease, and dirt from the
pipeline.
Prepare pipe ends and install valves in accordance with the pipe manufacture's instructions for
the joint used.
Do not deflect the pipe-valve joint. Minimize bending stresses in the valve end
connection with pipe loading.
If excessive seat leakage occurs during start-up, recheck the installation and
eliminate any distortion to the valve body.
Ensure the valve and pipeline flanges are concentric to ensure proper flange sealing and seat
leakage control.
Tighten the flange bolts or studs in a crisscross pattern and minimum of four stages.

Fusion/Powder Coated Valves

Valves with fusion/powder coated exterior paint require flat washers to be installed
under the flange nuts when installing the valve to the pipeline flange to prevent the
paint from cracking or chipping.
D12041
Page 4
September 2015