Dell VEP4600 Manuale di installazione - Pagina 19
Sfoglia online o scarica il pdf Manuale di installazione per Server Dell VEP4600. Dell VEP4600 40.
Anche per Dell VEP4600: Manuale di configurazione (23 pagine), Manuale di installazione (40 pagine)
NOTE:
Do not the use the mounted two-post rails as a shelf or a workplace.
Rack mount safety considerations
•
Rack loading—Overloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment and causing
personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at the bottom of the
rack, then work to the top. Do not exceed your rack's load rating.
•
Power considerations—Connect only to the power source specified on the unit. When you install multiple electrical components in a
rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded power sources and extension
cords present fire and shock hazards.
•
Elevated ambient temperature—If installed in a closed rack assembly, the operating temperature of the rack environment may be
greater than the room ambient temperature. Use care not to exceed the 45°C maximum ambient temperature of the platform.
•
Reduced air flow—Install the equipment in the rack so that the amount of airflow required for safe operation of the equipment is not
compromised.
•
Reliable earthing—Maintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections other
than the direct connections to the branch circuit, for example, use of power strips.
•
Do not mount the equipment with the back panel facing downward.
Two-post installation
To easily configure your rack for installation of the VEP4600, use the two-post rack mounting system provided. To complete this
installation, supply four rack-mounting screws.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
Figure 7. Two-post rail
1U front-rack installation
1. Attach the inner platform rails to the VEP4600.
Line up the half-holes on the rail with the mounting heads on the platform and attach the rail to the platform. Slide the rail back until it
locks into place.
VEP4600 installation
19