3 Day Blinds ARCH Istruzioni di montaggio/installazione - Pagina 2

Sfoglia online o scarica il pdf Istruzioni di montaggio/installazione per Tende per finestre 3 Day Blinds ARCH. 3 Day Blinds ARCH 8.

Please make sure that you have the following:
• Steel tape measure
• Power Drill and
• Flathead and Phillips screwdriver
• Pencil
• Level (for outside mount)
• Awl (or tool for starting a screw hole)
Included are the screws needed for a normal installation. Depending
on the mounting surface, fasteners other than the screws provided
may be required. Wall board and plaster require the use of anchors
such as expansion or toggle bolts. Bricks, tile and stone need
special plugs and drill bits. Wood should always be pre-drilled to
avoid splitting.
Your wood arch requires some assembly. In your shipment you
should have received the following items:
NOTE: The number of items shipped is dependent on the size of the arch.
Shim
Arch Bottom Rail

GeTTInG STarTed

/
" Drill Bit (for stand alone arches only)
1
16
arch and hardware
Vertical Supports
1
/
1
• Please DO NOT remove the
wood shims in the grooves of
each support until installation
is complete. These shims are
necessary to keep the wood
supports from splitting during
installation
Screws
#6 x
1
#8 x
/
"
3
4
" Drywall Screw
4
Page 1
/
"
2
Wood Slats