Dell EMC PowerSwitch S5148F-ON Manuale di installazione - Pagina 16
Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell EMC PowerSwitch S5148F-ON. Dell EMC PowerSwitch S5148F-ON 45.
Anche per Dell EMC PowerSwitch S5148F-ON: Manuale di configurazione (20 pagine)
Figure 5. GND lug assembly
1. Remove the two installed M3 screws from the lower-left side of your switch.
NOTE:
Keep these screws.
2. Remove the bracket assembly from the shipping bag.
3. Clean the bracket and lug surfaces thoroughly and apply an anti-oxidant solution to the mating surfaces.
4. Attach the switch ground using the
5. Using the two removed screws, attach the GND lug bracket assembly to your switch, as shown.
Torque the M3 screws to ±4-5 in-lbs.
Figure 6. Attach the GND lug assembly
16
NEBS compliance
Ground cable
instructions.