Dell S4248FBL-ON Manuale di installazione - Pagina 27

Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell S4248FBL-ON. Dell S4248FBL-ON 47. S4200-on series
Anche per Dell S4248FBL-ON: Manuale di configurazione (29 pagine)

Dell S4248FBL-ON Manuale di installazione
Figure 15. Front rack installation
NOTE:
Do not the use the mounted Ready-Rails as a shelf or a workplace.
3
Tighten the two thumb screws and rack screws.
To remove the switch from the rack or cabinet, press in the two side-release bars on the switch at the same time and slide the switch
forward.

Ground cable

NOTE:
For AC-powered switches, although the third conductor of the AC power cord provides a ground path, Dell EMC
recommends grounding your switch with a dedicated ground wire.
NOTE:
For DC-powered switches, the only way to safely ground your switch is to attach a dedicated ground wire.
Depending on the type of switch, to attach a ground cable to the switch, you need M3 or M4 screws.
The switch ships with one of the following two configurations:
One threaded hole using an M3 screw.
Two threaded holes using one of the two M4 screws.
In both configurations, the ground cable is not included. To properly ground the switch, Dell EMC recommends a one- or two-hole lug, M3
or M4 hole size. The ground lugs must be a UL-recognized, crimp-type lug.
CAUTION:
Grounding conductors
must be made of copper. Do not use aluminum conductors.
S4200-ON Series installation
27