Dell S6000-ON Manuale di installazione - Pagina 15
Sfoglia online o scarica il pdf Manuale di installazione per Interruttore Dell S6000-ON. Dell S6000-ON 41. Open networking
Anche per Dell S6000-ON: Manuale introduttivo (26 pagine), Manuale di risoluzione dei problemi (29 pagine)
To install the S6000–ON system, Dell EMC recommends completing the installation procedures in the order presented in this chapter.
Always handle the S6000–ON and its components with care. Avoid dropping the system or its field replaceable units (FRUs).
WARNING:
ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the S6000–ON and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this system.
Topics:
•
Unpack the system
•
Rack or cabinet hardware installation
•
Ground cable attachment
•
QSFP+ optic installation
•
System power-up
Unpack the system
NOTE:
Before unpacking the system, inspect the container and immediately report any evidence of damage.
When unpacking the S6000-ON switch, make sure that the following items are included:
•
One S6000-ON switch
•
One RJ-45 to DB-9 female cable
•
Two sets of rail kits—no tools required
•
Two PSUs
•
At least one country/region-specific AC power cord
•
S6000–ON Getting Started Guide
•
Safety and Regulatory Information
•
Warranty and Support Information
Unpacking Steps
1
Place the container on a clean, flat surface and cut all straps securing the container.
2
Open the container or remove the container top.
3
Carefully remove the switch from the container and place it on a secure and clean surface.
4
Remove all packing material.
5
Inspect the product and accessories for damage.
S6000–ON installation
5
S6000–ON installation
15