Award PM580/1s Istruzioni per l'uso e l'installazione - Pagina 6
Sfoglia online o scarica il pdf Istruzioni per l'uso e l'installazione per Piano cottura Award PM580/1s. Award PM580/1s 12.
INSTALLATION
The electrical connection of this hob should be carried out by an
authorised service personal or a qualified electrician, according to the
instructions in this guide and in compliance with the current regulations.
· Prior to installation, ensure that the local distribution conditions and the
adjustment of the appliance are compatible.
· The laws, ordinances, directives and standards in force in the country of
use are to be followed (safety regulations, proper recycling in accordance
with the regulations, etc.)
Locating your built-in hob
After removing the packaging material from the appliance and its accessories,
ensure that the hob is not damaged. If you suspect any damage, do not use
the appliance and contact an authorised service personnel or a qualified
electrician immediately.
· This built-in hob is to be inserted into a cut out of a worktop. It will be
electrically connected with the switch box below, especially provided for
this purpose.
7