EarthWay 2130 Istruzioni per il montaggio e il funzionamento - Pagina 2
Sfoglia online o scarica il pdf Istruzioni per il montaggio e il funzionamento per Spreader EarthWay 2130. EarthWay 2130 4. High-output broadcast spreader
Anche per EarthWay 2130: Istruzioni per il montaggio (5 pagine)
5. Install handle shaft to lower handles and pivot & bracket assembly as
shown. Using 2" bolts and locknuts.
TIGHTEN BOLTS AND NUTS NOW.
6. (This step is only required if you want to change the position of the
handles) NOTE: BEFORE INSTALLING GAUGE AND UPPER
HANDLES TO HANDLE SHAFT, UPPER HANDLES FEATURE
THREE POSITIONS FOR OPERATOR'S COMFORT.
If operator chooses middle or upper positions, use handle spacer in hole
nearest to handle grips.
Insert 2" bolt through upper handle, then through handle spacer through
other upper handle and secure with locknut.
DO NOT TIGHTEN LOCKNUT YET. TIGHTEN THIS NUT LAST.
Now slide the u
h
pper
andle
end with the bolt holes closer to the end).
Install gauge & lever using (2) 2" bolts. Be sure gauge is on left hand
side. Tighten locknuts to gauge first.
TIGHTEN ALL HARDWARE NOW.
Gauge & Lever
Lever Tension Nut
7. Install Control Rod by installing flattened end of Control Rod into Lever on Gauge
as shown. Turn to lock in place. {Make sure that there is a plain 1/4-20 Hex Nut
threaded about halfway up the threads}
Push lever forward to full OPEN setting. Align and push the Control Rod through
the angle attached to the Pivot Bracket. Now install 1/4-20 regular nut on to
control rod. {One nut on either side of the angled plate}
Next pull pivot & bracket back so that the shut off plate in the hopper is in the full
open position and adjust the Hex Nuts on the Pivot Bracket angle to secure the
angled bracket. Now tighten the nuts against the pivot angled bracket to prevent
change in calibration.
1/4 - 20 Lock-nut
Pivot Bracket
1/4 - 20 x 2" Bolt
assembly over the h
andle
Control Rod
Tabbed Hole
Control Rod
POSITIONS
LOWER
MIDDLE
UPPER
(on the
s
haft
Handle Shaft
Upper Handles
Handle
1/4-20
Spacer
Locknuts
Long end
Pivot
Bracket
1/4-20 x 2"
Hex Head
Bolt
Gauge &
Lever Assembly
1/4-20
Hex Nuts
Control
Rod
PAGE 2