Allpro APS2730H Istruzioni per la riparazione ed elenco delle parti - Pagina 9
Sfoglia online o scarica il pdf Istruzioni per la riparazione ed elenco delle parti per Idropulitrice Allpro APS2730H. Allpro APS2730H 16.
Servicing V-Packings
1. Remove manifold as outlined in Pumping Section
on page 8.
2. Carefully pull packing retainer from manifold.
Examine o-ring, and replace if cut or damaged.
3. Remove v-packing and head ring. Pull out interme-
diate retainer ring. Remove second v-packing and
second head ring.
4. Inspect all parts and replace as necessary.
5. Thoroughly clean packing cavities and examine for
debris or damage.
6. Lightly grease packing cavities and replace the
packings in the following order: head ring, v-pack-
ing, intermediate ring, head ring, v-packing, pack-
ing retainer. Install o-ring in retainer groove.
CAUTION
Install parts in proper order and facing proper direc-
tion. Improperly installed parts will cause a malfunc-
tion.
7. Reassemble manifold as instructed in Servicing
Plungers on page 8.
9
309887