Burlington RIV2 CHR Istruzioni per l'installazione - Pagina 2

Sfoglia online o scarica il pdf Istruzioni per l'installazione per Prodotto idraulico Burlington RIV2 CHR. Burlington RIV2 CHR 4.

IMPORTANT
We recommend that this product is installed by a qualified professional contractor.
Such as a plumber who is certified by NVQ (National Vocational Qualification) or
SNVQ (Scottish National Vocational Qualification) Level 3.
Please check this product immediately to ensure that it has not been damaged and
is complete. Before installation, please make sure this product is the correct model
and you have all the parts required for installation and using.
Please read these instructions carefully and keep it for future reference.
RIV3 CHR/GOLD
106
120
75
104
RIV2 CHR/GOLD
120
127
75
104
Riviera 1000 shower plate and handles Chrome
Riviera 1000 shower plate and handles Gold
Riviera 1500 shower plate and handles Chrome
Riviera 1500 shower plate and handles Gold
Installation of RIV3 CHR/GOLD trim sets (needs to be used with HOX.005V)
HOX.005V parts included
B
RETAINING
SLEEVE
A
TEMPERATURE
SCREW
HANDLE FIXING
in the box)
HANDLE
BASE
D
Figure 1
RIV3 CHR/GOLD parts included
RETAINING
BACK PLATE
SLEEVE
HANDLE
FIXING
SCREW
HANDLE
HANDLE
BASE
BACK PLATE
HANDLE
FIXING
HANDLE
SCREW
(supplied
HANDLE
HOT
C
RIV2 CHR
RIV2 GOLD
RIV3 CHR
RIV3 GOLD
HANDLE
SCREW
COLD