Olympus E-PL1 Manuale d'uso - Pagina 8
Sfoglia online o scarica il pdf Manuale d'uso per Camera Accessories Olympus E-PL1. Olympus E-PL1 9. Camera underwater housing
Anche per Olympus E-PL1: Specifiche tecniche (5 pagine)
Wear the wrist strap; it is easy to inadvertently let go of the housing, especially if you are
distracted.
5.3 Cleaning & Storage.
The body & lid of the housing are made of 6061 Aluminum and Acrylic respectively. 6061
Aluminum is selected for its outstanding strength stiffness, hardness and toughness and epoxy
paint is applied to provide extra protection, While Acrylic for its crystal clear transparency and high
gloss surface. Both of them have good resistance to weathering, although long-term exposure to
sunlight should be avoided. Normal operating temperature range is 3°C to 36°C (Storage
temperature: -10°C to 50°C)
It is good practice to rinse off your housing with fresh water after every dive. Avoid to exposure to
fine sand and sun light. After a series of 10 or more dives, e.g. after a dive holiday, it is
recommended to immerse the housing for 1-2 hours in warm water to dissolve any salt deposits
that may have built up. No chemical cleaners should be used.
Important
: For long term storage please remove the main closure o-rings from body.
5.4 Transportation.
Please protect the housing during transportation. It is recommended to remove the handle, and
shutter extension, and wrap the camera in foam or bubble wrap.
5.5 Accidents
The impact resistance of the housing is excellent. However after an accident the alignment of the
housing may have been altered. Therefore in the event of your housing suffering an impact force,
e.g. being dropped, it is essential that you do not use the housing for diving. Please return the
housing immediately for service and put a note inside to indicate the nature of the accident, so
that the severity can be assessed.
6. Service
To ensure the continued performance of your housing, it should be serviced every year, or after
every 200 dives whichever is earlier. Please note the terms for servicing the housing posted at our
website. A full service will include:
Inspect all components for wears or damage (report if repair necessary),
Clean all sealing surfaces,
Replace all O-ring seals,
Hydrostatic pressure test to 10 Bar.
Note: Replacement of damaged components may require additional cost.
8