ABB 10D1475 Manuale di istruzioni per l'installazione - Pagina 6

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Strumenti di misura ABB 10D1475. ABB 10D1475 10. Magnetic flowmeter

INSTALLATION OF 1/2 - 4 INCH METERS
• Install a gasket at meter inlet and
outlet, as applicable for meter type.
• Insert meter (with gaskets) between
pipe flanges.
• Insert two lower mounting studs with
adaptor
sleeves
flanges.
• Insert top two mounting studs and
sleeves (this will center the meter in
pipeline);
install
studs, if required.
• Thread nuts on studs. Use proper
torque and tightening sequence (i.e.
1-5-3-7, 2-6-4-8) to maintain even
pressure distribution as shown in
the figure to the right.
FIGURE 5. Meter Mounting Diagram, 1/2 - 4 in. Sizes
5
INSTALLATION INSTRUCTIONS
between
pipe
other
mounting
ADAPTER SLEEVES