ABB 2117/11 U-500 Manuale operativo - Pagina 11
Sfoglia online o scarica il pdf Manuale operativo per Strumenti di misura ABB 2117/11 U-500. ABB 2117/11 U-500 14. Dali potentiometer for broadcast operation
DALI potentiometer for broadcast
operation
Pos: 30 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Überschriften (--> Für alle Dokumente <--)/2. Ebene/M - O/Montage @ 18\mod_1302615960458_15.docx @ 103424 @ 2 @ 1
7.2
Mounting
Pos: 31 /#Neustruktur#/Online-Dokumentation/Sicherheitshinweise und Hinweise (--> Für alle Dokumente <--)/Warnhinweise/Sicherheit - 230 V @ 18\mod_1302606816750_15.docx @ 103308 @ @ 1
Warning
Electric voltage!
Risk of death and fire due to electrical voltage of 230 V.
–
Work on the 230V supply system may only be performed by authorised electricians!
–
Disconnect the mains power supply prior to installation and/or disassembly!
Pos: 32 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Montage/alle Geräte/Montage - UP-Dosen - DIN 49073-1 @ 21\mod_1331210080219_15.docx @ 202029 @ @ 1
The device must only be installed in suitable flush-mounted sockets (DIN 49073-1).
Pos: 33 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Montage/Dimmer/Montage - 2117 @ 21\mod_1331210177831_15.docx @ 202044 @ 2 @ 1
7.3
Inserting optical fibres
Fig. 9:
Insert the optical fibre directly into the two middle openings between the connecting terminals. In the process,
align the plastic lug in the direction of the potentiometer axis.
Hint
•
The glow lamps included with the control elements must not be used.
•
The control elements of the impuls series are not suitable for illumination!
Pos: 34 /#Neustruktur#/Modul-Struktur/Online-Dokumentation/Steuermodule - Online-Dokumentation (--> Für alle Dokumente <--)/++++++++++++ Seitenumbruch ++++++++++++ @ 9\mod_1268898668093_0.docx @ 52149 @ @ 1
| 1473-1-7978
Installation and electrical
! top
connection
Art.
3855
3856
— 11 —