Arcisan SY02920 Manuale - Pagina 2

Sfoglia online o scarica il pdf Manuale per Apparecchiature per il bagno Arcisan SY02920. Arcisan SY02920 4. Synergii shower panel left hand operation

INSTALLATION
IMPORTANT INFORMATION
We recommend that mounting brackets are secured into stud
work. If unable, prior to installation make sure the wall can
support a load of 12kg.
Prior to installation of shower
panel please refer to
Recommended Installation Heights
page for dimensions.
Step 1
Attach 1/2" elbow connector to water
outlets in wall. Must be orientated
90 degrees (
) facing down.
Step 2
Attach mounting brackets to the
finished wall. Use a level to be sure that
the bracket is fixed straight.
Ensure correct hardware is used to fix
bracket to wall. For mounting position,
refer to Recommended Installation
Height page.
40
Cold 1/2" BSP
Hot 1/2" BSP
INSTALLATION
Step 3
Screw flexible hoses onto wall
connections making sure the correct
hoses are connected to the correct
outlets. Do not over tighten the nuts.
Once the connections are made, turn
on mains water to check for leaks.
Step 4
Carefully hang the shower panel onto
the mounting brackets, ensuring that
both top and bottom brackets are
resting in the correct location on the
back of the panel.
Once the panel is in place, run a line of
silicone down each side of the shower
panel to fix it in place.
Step 5
Finally, connect the handshower to
the bottom water outlet on the side of
shower panel.
Do not overtighten the nut.
Silicone