ABB A101-H Series Istruzioni di montaggio originali - Pagina 12

Sfoglia online o scarica il pdf Istruzioni di montaggio originali per Caricabatterie ABB A101-H Series. ABB A101-H Series 20. Radial turbocharger

Assembly Instructions / A101-H
4 Installing the turbocharger / 4.1 Inserting gaskets into the bracket
4

Installing the turbocharger

4.1

Inserting gaskets into the bracket

CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
Always use new gaskets and insert them carefully into the slot.
u
The oil is supplied (02) and drained (03) through the bracket (01).
The necessary sealing is provided by O-rings. The O-rings are not included in the ABB Turbo
Systems scope of delivery.
Fig. 5: Inserting gaskets into the bracket
01
Bracket
02
Oil supply
03
Oil drain
Pin (06) as installation safety device
Turbochargers can have an oil inlet either on their right or left side; the oil inlet position can
be different for the turbocharger fitted on the left and on the right engine bank.
A pin can be installed in every support as an installation safety device to prevent inadvertent
incorrect fitting. This pin fits into the respective slot on the foot of the bearing casing. In-
structions of the enginebuilder must be observed.
© Copyright 2019 ABB. All rights reserved.
04
Slot for O-ring
05
O-rings
06
Pin (optional)
HZTL455311P0038_EN
Rev.A
December 2019