Shimano SRD Manuale di montaggio - Pagina 7
Sfoglia online o scarica il pdf Manuale di montaggio per Attrezzature per il fitness Shimano SRD. Shimano SRD 23. Footstretcher
ROWING
(5) Installing the Upper Pipe
Procedure (5) -1: Loosen the
bolts shown by orange arrows
(↑)and slide down the Binding
(↑)and slide down the Binding
Unit. With this operation it will
be easier to manipulate the
Upper Pipe.
Procedure (5) -2: Loosen the
bolts shown by green arrows (↑)
and install the upper pipe.
© 2009 Shimano, Inc. ALL RIGHTS RESERVED
y g
(↑)
7