Siemens 15-FSV-500 Installazione Funzionamento e manutenzione - Pagina 7
Sfoglia online o scarica il pdf Installazione Funzionamento e manutenzione per Interruttore Siemens 15-FSV-500. Siemens 15-FSV-500 48. Vacuum circuit breakers fsv series and msv series
General
C i rcuit breakers are normally shipped from the factory com
pletely assembled . Observe weight markings on the carton
and ensure that capable handling equ ipment is used.
Remove packagi ng carefully with the correct tools. Check each
item with the shipping man ifest If any shortage or damage
is found, immediately call it to the attention of the local
freight agent handling the shipment. Proper notation should
be made by him on the freight bill. This prevents any contro
versy when claim is made and fac i l itates adjustment
When moving breaker to location with a fork lift, observe
weight and lifting locations on the carton. Carefully
remove carton and plastic cover.
When moving breaker to location with a crane, observe
weight and sling lifting locations on the carton. Use a
spreader to prevent frame distortion and/or damage to
the barriers. Carefully remove carton and plastic cover.
Figure 1 Circuit Breaker Handling Instructions
Remove ramp pieces nailed to the back of the pallet.
Remove hold down bolt and angle located in the front
and back of the breaker.
Place ramp pieces in front of the pallet in line with the
breaker wheels and nail to pallet as shown. Slowly roll
the breaker off the pallet.
Page 2