ABB ACH550 series Manuale di avvio rapido - Pagina 4
Sfoglia online o scarica il pdf Manuale di avvio rapido per Azionamenti in corrente continua ABB ACH550 series. ABB ACH550 series 6. Pumpsave 4.1, energy savings calculator for pump drives
Anche per ABB ACH550 series: Manuale d'uso (14 pagine), Manuale di installazione, funzionamento e manutenzione (18 pagine)
Step 6: On the back plane of the board and plastic housing push the 4 tabs that hold the board in place away from the
control board (SMIO-01). Lift board and slide it out of the plastic cover of board enclosure.
Step 7: Remove small ribbon cable connector from control board (SMIO-01). You keep the existing ribbon cable with 40
pin connector in place.
Step 8: Mount the 64652745 (OPEX-01 Interface Board) onto the control board (SMIO-01). The 64738852 – Connection
Cable connects to the 8-pin connection on the 64652745 (OPEX-01 Interface Board) and the RJ45 connector of the
64738852 connects to the removed control panel (SMIO-01) through the cutout on the 64652745 (OPEX-01 Interface
Board).
LVD-EOTKN094U-EN REV A
Effective: 2022-06-30
4