Cisco N540-Front Haul Preparare l'installazione - Pagina 3

Sfoglia online o scarica il pdf Preparare l'installazione per Router di rete Cisco N540-Front Haul. Cisco N540-Front Haul 14.

Cisco N540-Front Haul Preparare l'installazione
Prepare for Installation

Airflow for Site Planning

For site planning, the Maximum System Airflow at maximum system temperature is 90.0CFM for
N540-FH-CSR-SYS and 125.0CFM for N540-FH-AGG-SYS.

Airflow Guidelines

Cool air is circulated through the router by fans that are located along the rear side of the router. The internal
fans maintain acceptable operating temperatures for the internal components by drawing in cool air through
the vents, and circulating the air through the router.
To ensure adequate airflow, we recommended that you always maintain this minimum clearance distance for
N540-FH-CSR-SYS:
• Front clearance—5 inches (12.7 centimeters)
• Rear clearance—2 inches (5.08 centimeters)
To ensure adequate airflow, we recommended that you always maintain this minimum clearance distance for
N540-FH-AGG-SYS:
• Front clearance—5 inches (12.7 centimeters)
• Rear clearance—6.0 inches (15.24 centimeters)
Airflow for Site Planning
Prepare for Installation
3