ABB ACQ80-01 Manuale di installazione e avviamento rapido - Pagina 6

Sfoglia online o scarica il pdf Manuale di installazione e avviamento rapido per Azionamenti in corrente continua ABB ACQ80-01. ABB ACQ80-01 14.

ABB ACQ80-01 Manuale di installazione e avviamento rapido
3.
Connect the power cables. For the tightening torques, refer to
Connect the phase conductors of the motor cable to terminals T1/U, T2/V and T3/W. Connect the twisted shield of
the cable to the grounding terminal. (a)
Connect the input power cable to terminals L1, L2 and L3. Connect the twisted shield of the cable and the additional
PE conductor to the grounding terminal. (b)
Tighten the clamps of the power cable grounding shelf onto the stripped part of the cables (c). Torque the clamps to
1.2 N·m (10.6 lbf·in).
If used, connect the brake resistor or brake chopper cables.
R4
INPUT
PE
L1
L2
L3
3b
Note: The illustration above shows frames R1...R2. Frames
R3...R4 are similar.
4.
Frame R4: Install the grounding shelf.
R4
4
5.
Frame R5: Install the cable box plate (a) and shroud (b).
R5
5a
6.
Attach the cables outside the drive mechanically.
BRAKE RES
MOTOR
R+
R-
T1
T2
T3
UDC+
U
V
W
3a
3c
5b
Terminal data for the power cables
R5
3b
PE
6
.
3a
3c