Argo Wallner PPS 330CTS Manuale di istruzioni - Pagina 11
Sfoglia online o scarica il pdf Manuale di istruzioni per Tritacarte Argo Wallner PPS 330CTS. Argo Wallner PPS 330CTS 12.
MALFUNTION/MAINTENANCE
PROBLEMS
No operation
No operation after long
time operation
Stop at shredding
Excess squeaking
and rubbing noise
Paper jam
© ARGO S.A.
CHECKLISTS
- The power plug is properly
inserted to main supply?
- „ON" button is set at „ON"
position?
- „ON" button is at „ON"
position but no display.
- Basket at stand but power
light off.
- No operation when insert
paper?
- Checked above but no
operation and no power light.
-
Machine
overheat
display?
- Machine is continuously
shredding for a long time?
- Without oiling to the cutting
system periodically.
- Squeaking and rubbing noise
at shredding.
Exceeding
the
shredding
capacity:
- More than 11 sheets of
2
70g/m
A4 paper at one pass.
- The paper is not fed squarely
into the feed opening.
Nasza oferta w internecie: www.argo.pl
SOLUTIONS
- Fully put the power plug to
the outlet.
- Press the "ON" button to
„ON" position foroperation.
- Check basket is out of stand.
Put basket back to stand.
- Basket should be put into
stand to trigger the safety
interlock switch for operation.
- Paper should be inserted to
trigger the sensor at center.
- Send back to your local
service for repair.
- Unplug
the
is
from
main supply. Allow
to
cool
down to
temperature and resuming
operation.
- Unplug
the
from
main supply. Allow
to
cool
down to
temperature and resuming
operation.
- Perform the cutter oiling
instruction to lubricate the
cutting system.
- Press the „REV" button
for
reverse
running
free excess paper. Then
press the „FWD" button for
cutting system. If serious jam
occurred, send back to local
service for repair.
11
machine
room
machine
room
and