ACU-RITE 06008 Manuale di istruzioni - Pagina 5
Sfoglia online o scarica il pdf Manuale di istruzioni per Accessories ACU-RITE 06008. ACU-RITE 06008 8. 3-in-1 weather sensor
3-in-1 Sensor Installation Guidelines
INSTALLATION HEIGHT
off the ground, in an open area. Higher is better for wind measurements - the
National Weather Service recommends 33 feet high!
MOUNTING OPTIONS
onto wooden posts or surfaces that are 2"x 4" or larger. The sensor can also be
mounted directly to 3/4" steel pipe
(available at hardware stores and
home centers).
LEVEL INSTALLATION
bubble level (not included) to ensure
level installation for accurate wind
measurement.
Top or Side Mount
1. Insert the mounting base into the
hole on the bottom of the sensor.
2. Use the set screw included in the
hardware bag to fasten the lower
sensor housing to the mounting
base.
3. Fasten mounting base to a post or
railing using the 4 longer screws.
Pipe Mount
1. Insert pipe or similar item all the way
into the hole on the bottom of the sensor.
Note: Mounting base is not used.
2. Use the set screw included in the hardware
bag to fasten the lower sensor housing
securely to the pipe.
The 3-in-1 sensor is now ready to use.
Basic Setup is Complete
The 3-in-1 sensor will now synchronize with the companion unit. It may take a few
minutes for synchronization to complete.
Mount the sensor at a minimum height of 5 feet (1.5 meters)
The included mounting bracket is designed to screw directly
Use a
Top Mount
5
Side Mount
Pipe Mount
Do not install during
electrical storms.
Do not place pipe
or sensor near
electrical lines or
electrical equipment.