Cisco Firepower Management Centers Manuale di istruzioni - Pagina 20
Sfoglia online o scarica il pdf Manuale di istruzioni per Server Cisco Firepower Management Centers. Cisco Firepower Management Centers 20. Memory upgrade
Installing the Chassis Cover
Installing the Cover on Firepower Management Center 1500 and 3500
To install the cover on a Firepower MC1500 or MC3500:
Note
A nonskid surface or a stop behind the MC1500 or MC3500 may be needed to prevent the device from
sliding on your work surface.
Step 1
Place the cover over the device as shown in
the chassis sidewalls.
Step 2
Slide the cover forward to engage the recessed edge of the cover with the front of the chassis (see "2" in
Figure
Step 3
Insert the security screw at the center of the top cover (see "3" in
Figure A-20
1
2
Cisco Firepower Management Center 750, 1500, 2000, 3500, and 4000 Hardware Installation Guide
A-20
A-20). Make sure the cover latch clicks into place.
Installing the Cover on a MC1500 and MC3500
Top cover
Recessed edge
Appendix A
Memory Upgrade Instructions for Firepower Management Centers
Figure A-20
so that the side edges of the cover sit just inside
3
Security screw
— —
Figure
A-20).