Cisco ONS 15454 Disimballaggio e installazione

Sfoglia online o scarica il pdf Disimballaggio e installazione per Server Cisco ONS 15454. Cisco ONS 15454 42. Four-shelf and zero-shelf bay assembly
Anche per Cisco ONS 15454: Manuale di istruzioni per l'installazione (22 pagine), Installare (32 pagine), Installare (32 pagine), Disimballaggio e installazione (40 pagine)

Cisco ONS 15454 Disimballaggio e installazione
Unpacking and Installing the Cisco ONS 15454
Four-Shelf and Zero-Shelf Bay Assembly
Overview
The Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay Assemblies provide a dual-feed pre-wired
TPA-type Fuse and Alarm Panel, two vertical fiber ducts, and two 2.38-inch vertical extenders and
extender bases. The Four-Shelf Bay Assembly also provides a pre-installed, four-shelf configuration that
includes four ONS 15454 shelf assemblies with configured backplane interface connectors (BICs).
This guide describes how to unpack and install the Cisco ONS 15454 Four-Shelf and Zero-Shelf Bay
Assembly. Because it is a complete system, installation simply requires you to remove the unit from the
shipping pallet, move the unit into place, secure it, supply power and ground attachment.
This guide includes the following sections:
Corporate Headquarters:
Cisco Systems, Inc., 170 West Tasman Drive, San Jose, CA 95134-1706 USA
Copyright © 2002. Cisco Systems, Inc. All rights reserved.
Safety Recommendations
Recommended Materials
Unpacking Instructions
Installation Instructions
Install the Four-Shelf and Zero-Shelf Bay Assembly
Slab Floor Plan
Raised Floor Plan
Mounting a Single Shelf Assembly
Mounting the Fuse and Alarm Panel
Cabling Illustrations
Fuse and Alarm Panel Wiring
Install the Power and Ground
Optional Kits