Cisco SCE8000 GBE Procedure di rimozione e sostituzione - Pagina 31
Sfoglia online o scarica il pdf Procedure di rimozione e sostituzione per Server Cisco SCE8000 GBE. Cisco SCE8000 GBE 36. 10gbe platform
Anche per Cisco SCE8000 GBE: Manuale di avvio rapido (25 pagine), Manuale di configurazione (18 pagine), Installazione (21 pagine)
Chapter 9 Removal and Replacement Procedures
SPA Installation and Removal
SPA Installation and Removal
During this procedure, wear grounding wrist straps to avoid ESD damage to the card. Do not directly
Warning
touch the backplane with your hand or any metal tool, or you could shock yourself.
Statement 94
SPAs can be inserted or removed independently from the SIP. Removal of a SIP with installed SPAs is
also supported.
Cisco SCE8000 10GBE Installation and Configuration Guide
9-31
OL-26784-02