Cisco UCS B260 M4 Nota di installazione e manutenzione - Pagina 32

Sfoglia online o scarica il pdf Nota di installazione e manutenzione per Server Cisco UCS B260 M4. Cisco UCS B260 M4 50. Blade server
Anche per Cisco UCS B260 M4: Nota di installazione e manutenzione (46 pagine)

Cisco UCS B260 M4 Nota di installazione e manutenzione
Installing a New CPU and Heat Sink
Figure 13: Using the CPU Pick and Place Tool to Insert the CPU
1
Step 6
Close the socket latch. See callout 1 in the following figure.
Step 7
Secure the first hook, which has the following icon: See callout 2 in the following figure.
Step 8
Secure the second hook, which has the following icon:
Cisco UCS B260 M4 and B460 M4 Blade Server Installation and Service Note for Servers with E7 v3 and E7 v2 CPUs
24
Alignment mark on the
2
tool button/handle
Servicing the Blade Server
Alignment mark on the
CPU socket
See callout 3 in the following figure.