AEMC instruments 2121.04 Manuale d'uso - Pagina 12

Sfoglia online o scarica il pdf Manuale d'uso per Apparecchiature di prova AEMC instruments 2121.04. AEMC instruments 2121.04 20.

4.2

Phase Rotation Tester Operation

4.2.1
1.
Connect the "A" (black) and "B" (red) leads on the phase
rotation side of the meter to a known AC power source between
100 and 600V
not, refer to Chapter 5 of this manual and the discussion on
fuse replacement.
2.
Connect the "C" (blue) and "B" (red) leads on the phase rotation
side of the meter to a known AC power source between 100
and 600V
refer to Chapter 5 of this manual and the discussion on fuse
replacement.
4.2.2
1.
Connect the test leads to the 3-phase input terminals marked
A-B-C.
2.
Connect the alligator clips to the terminals of the 3-phase
power source to be tested. Connecting order is optional.
3.
Make sure that all three LEDs (A-B-C) for open phase check
are on. If all are on, there is no open phase power problem.
If LED "A" or "C" are out, verify that power is present using a
voltage tester or DMM.
10
nd Quality Products Online at:

OPERATION

Pretest Procedure

. Make sure that the "A" LED lights. If it does
AC
. Make sure that the "C" LED lights. If it does not,
AC
Operation
Phase & Motor Rotation Tester Model PMR-1
GlobalTestSupply
www.
CHAPTER 4
.com