Ariel WS-9090K Direzione di installazione - Pagina 6
Sfoglia online o scarica il pdf Direzione di installazione per Apparecchiature per il bagno Ariel WS-9090K. Ariel WS-9090K 8. Steam bathroom
STEP 4
4 X 2 5
5. Assembly of sliding door
put the sliding door onto the up
and down aluminum track to keep
it balance.
05
4. Assembly of fixed glass door.
Active chain wheel of glass
C
C
STEP 5
(1) The electrical pitch
Press
pitch can open the machine, the temperature
is the room temperature.The time will show 30m. At the same
time, it will open the ceiling lamp.Press
functions. (After the closure of the machine, the water case
will drainfor 2 minutes)
(2) The application of the back lamp
Press
,the sidelight is on. Press
lamp is out, press
a third press, the sidelight is out too.
3) The steam function
Press
,startup the steam function, the water case
will pump water automati-cally. After 60minutes or so, it
will generate steam. (When the water case is lack ofwater,
the controller will replenish automatically)
(4) The air draft function
Under the condition of turnning on, press
up air draft function, pressagain will colse it.
(5) The setting of time or temperature
1. Press
pitch can adjust the time from 1-99.
2. Press
pitch can adjust the temperature from
30-60 .
again will close all the
again, the ceiling
can start
10
-۹٠۹٠WSK