Whirlpool WGD5600SQ Manuale di istruzioni per l'installazione - Pagina 9

Sfoglia online o scarica il pdf Manuale di istruzioni per l'installazione per Asciugatrice Whirlpool WGD5600SQ. Whirlpool WGD5600SQ 20. 29" (73.7 cm) gas dryer
Anche per Whirlpool WGD5600SQ: Istruzioni per l'utente (16 pagine)

Whirlpool WGD5600SQ Manuale di istruzioni per l'installazione
Reversible Super Wide Side-Swing Door
E
F
1. Place towel (A) on top of dryer to protect surface.
2. Open dryer door. Remove bottom screws from cabinet side of
hinges (D). Loosen (do not remove) top screws from cabinet
side of hinges.
3. Lift door until top screws in cabinet are in large part of hinge
slot. Pull door forward off screws. Set door (handle side up) on
top of dryer. Remove top screws from cabinet.
4. Remove screws attaching hinges to door.
5. Remove screws at top, bottom and side of door (4 screws).
Holding door over towel on dryer, grasp sides of outer door
and carefully lift to separate it from inner door. Do not pry
apart with putty knife. Do not pull on door seal or plastic door
catches.
6. Be careful to keep cardboard spacer centered between doors.
Reattach outer door panel to inner door panel so handle is on
the side where hinges were just removed.
7. Attach door hinges to door so large part of hinge slot is at
bottom of hinge.
8. Remove door strike (E) from cabinet. Use a small, flat-blade
screwdriver to carefully remove 4 hinge hole plugs (F) on left
A
side of cabinet. Insert plugs in hinge holes on right side of
cabinet.
B
9. Insert screws in bottom holes on left side of cabinet. Tighten
screws halfway. Position door so large end of door hinge slot
C
is over screws. Slide door up so screws are in bottom of slots.
Tighten screws. Insert and tighten top screws in hinges.
D
10. Remove door strike plug (B). Insert the door strike you
removed in Step 8 in hole and secure with screw. Insert door
strike plug in original door strike hole and secure with screw.
11. Close door and check that door strike aligns with door catch
(C). If needed, slide door catch left or right within slot to adjust
alignment.
1. Check to be sure all parts are now installed. If there is an extra
part, go back through the steps to see which step was
skipped.
2. Check to be sure you have all of your tools.
3. Dispose of all packaging materials.
4. Check the dryer's final location. Be sure the vent is not
crushed or kinked.
5. Check to be sure the dryer is level. See "Level Dryer."
6. Plug into a grounded 3 prong outlet. Turn power on.
7. Remove the blue protective film on the console and any tape
remaining on the dryer.
8. Read your "Dryer User Instructions."
9. Wipe the dryer drum interior thoroughly with a damp cloth to
remove any dust.
10. Set the dryer on a full heat cycle (not an air cycle) for
20 minutes and start the dryer.
If the dryer will not start, check the following:
Dryer is plugged into a grounded 3 prong outlet.
Electrical supply is connected.
House fuse is intact and tight, or circuit breaker has not
tripped.
Dryer door is closed.
11. When the dryer has been running for 5 minutes, open the
dryer door and feel for heat. If you do not feel heat, turn the
dryer off and check to see whether gas supply line shutoff
valve is open.
If the gas supply line shutoff valve is closed, open it, then
repeat the 5-minute test as outlined above.
If the gas supply line shutoff valve is open, contact a
qualified technician.

Complete Installation

9