ErgoCentric upCentric Power & Data Rail Manuale - Pagina 7

Sfoglia online o scarica il pdf Manuale per Cremagliere e cavalletti ErgoCentric upCentric Power & Data Rail. ErgoCentric upCentric Power & Data Rail 19.

Installation Guide
upCentric Power & Data Rail
Build Power Infeed Legs:
a) Wall Power Infeed (WPI) Legs:
i. Attach foot to bottom of each leg using flat head screws (Q).
ii. Secure the Infeed plate using pan head screws (R).
WPI - END
WPI - TC
b) Ceiling Power Infeed (CPI) Legs:
i . Attach the Foot to the bottom of each leg using flat head screws (Q).
ii. Slide the plastic gasket (U) onto the four posts on top of each leg.
CPI - 180°
upCentric Power & Data Rail | Installation Guide
WPI - Wall Power Infeed
WPI - END 90° R
WPI - END 90° L
CPI - Ceiling Power Infeed
CPI - 90°
WPI - 90°
CPI - END
WPI - 180°
CPI - TC
7