Alderon Industries Mini Power Post PRPT-00003 Manuale d'uso - Pagina 7
Sfoglia online o scarica il pdf Manuale d'uso per Unità di controllo Alderon Industries Mini Power Post PRPT-00003. Alderon Industries Mini Power Post PRPT-00003 16. Pump connection center
Anche per Alderon Industries Mini Power Post PRPT-00003: Manuale di avvio rapido (2 pagine)
Installing Post (continued)
STEP 3: REMOVE BOTTOM COVER
The bottom enclosure cover is fastened by a single screw on
the bottom of the enclosure. Remove the screw and slide the
cover directly downward (3A) and pull directly away from the
enclosure (3B).
Wiring
STEP 1: WIRING CONNECTIONS
1) Route alarm float switch cable through Cable Grip A and
firmly tighten grip.
2) Route the underground feeder (UF) cable from the
indoor alarm panel through Cable Grip B and firmly
tighten grip.
3) Route incoming pump power UF cable through Cable
Grip D and firmly tighten grip.
4) Connect wires in Cable Grip D to the pre-installed Wago
connectors on wires coming out of Cable Grip C as shown
in the diagram.
5) Connect wires coming in Cable Grip A to wires coming in
Cable Grip B as shown in the diagram.
Note: NEVER leave ground wire exposed, use provided Wago
connectors for wire termination.
STEP 2: INSTALLING WIRE INTO WAGO CONNECTOR
1) Lift tab(s) upward.
2) Insert wire(s) into slot.
3) Press tab(s) downward.
4) Make sure wire(s) are secured.
Mini Power Post™ - USER GUIDE
3A
A
WAGO
BLACK
WAGO
WHITE
TO OPEN
WAGO
Alderon Industries™ - Leading Edge Control Products | 7
3B
C
BLACK
WHITE
B
D
WAGO
TO CLOSE
WAGO
WAGO
WAGO