Direct Supply Panacea 1000 Manuale d'uso - Pagina 15

Sfoglia online o scarica il pdf Manuale d'uso per Apparecchiature mediche Direct Supply Panacea 1000. Direct Supply Panacea 1000 20. Adjustable-height low bed

1
2
Figure 16
Figure 17
Figure 18
WARNING: Possible shock hazard. Unplug power cord
from wall outlet before performing any maintenance or
3
4
HB
service to control box.
Power Cord
Conduct a yearly inspection of power cord to ensure
efficient bed operation.
1. Check power cord to make sure it has not been
damaged. If power cord needs replacement due to
damage, remove bed from service until power cord has
been replaced.
Actuator and Control Box Information
Cable and Port Identification (Figure 16)
1.
Back Actuator (yellow)
2.
Knee Actuator (blue)
3.
Hi-Lo Actuator (red)
4.
Hi-Lo Actuator (red)
HB. Pendant (green)
NOTE: The actuators and control box contain no
serviceable parts. Overload protection is achieved via
current-sensing technology, which will automatically reset.
If any bed function fails to operate, check to see if bed is
overloaded or constrained from movement.
To Remove Control Box
1. Plugs and ports are numbered and color-coded so they
can be easily reinstalled later (See Actuator And Control
Box Information).
2. Remove cable clamp from control box (Figure 17).
3. Unplug all actuator cables and pendant/staff control plug.
4. Remove the control box retaining clip (Figure 18).
5. Slide control box off the actuator assembly.
6. To replace control box, reverse these instructions.
Actuator and Control Box Troubleshooting
Any loss of electrical function should be investigated with
the following steps:
1. Make sure that all cables are plugged in, including
pendant, staff control cables and AC power cord.
2. Switch pendant with a new one or one from a bed that
is functioning normally.
3. If these steps fail to resolve the problem, please contact
Direct Supply Equipment & Furnishings at 1-800-634-7328.
1-800-634-7328
directsupply.com
15