2. Installation
2.1. Unpacking
Your Hy-Sight unit is pre-assembled by Clark-Reliance and should arrive carefully packed and as one fully
assembled unit.
Care should be taken during the un-packing of the unit as all units contain glass
components that have the potential to have been broken through mishandling.
2.2. Visual Inspection
Upon receipt of your Hy-Sight unit visual inspect the unit for any sign of damage that may have of occurred
during shipping or mishandling.
During visual inspection, particular attention should be made to the glass cylinders internal and external
surfaces. Any sign of chips, cracks or imperfections on these surfaces may potentially reduce the safe
operating pressure as published.
In the unlikely event of damage being discovered or suspected to do not attempt installation under any
circumstances.
2.3. Positioning
The Hy-Sight unit can me mounted in any orientation, vertically or horizontally with the flow passing through in
either direction.
Locating & positioning the unit should be given careful consideration, to optimise the life time of the unit, it is
essential that the unit is not exposed to any of the following:
a) Piping loads or torsional forces. (the unit is not designed to be load bearing)
b) Sudden increases of pressure.
c) Excessive vibrations.
d) Rapidly fluctuating temperatures.
e) Other moving parts.
To maximise clarity of the media passing through the unit, we would recommend installation in a length of
pipe that has 24" of straight line pipe either side of the unit, promoting a laminar flow through the viewable
area.
2.4. Commissioning / Start Up
Following correct installation, the Hy-Sight unit should be brought into service slowly, gradually building the
pressure & temperature until the desired process values are reached. We would advise this is carried out
during a CIP process where the unit can be checked for leaks prior to the process media being introduced.